127mm f/9.4 OTA Construction - OTA Installing CD Knife-Edge Baffles (front of first baffle 2)

 

First baffle tacked in place with construction adhesive... (Click for enlarged view)

 

Here is another picture of the front of the first baffle tacked in three spots with construction adhesive. Now we are ready to apply silicon-latex caulk.