Fork Mount Construction - Top-of-Top/ Right Ascension Axis Box and Flange

Top-of-Top Right Ascension Axis Box and Flange (Click for enlarged view)
We are now ready to install the top panel of the RA Axis Box. This piece has the same dimensions as the bottom of the RA Axis box. The only difference being in that the flange will be mounted inside of the RA Axis box. Before the top is attached to the RA Axis Box, the T-6061 Aluminum shaft will be installed to the top section as noted in the previous slide.